Ansell, M, Holmes, M, Evans, R, Pasquire, C and Price, A (2009) Delivering Best Value in Highways Major Maintenance Schemes: Case Study. Journal of Construction Engineering and Management, 135(04), 235–45.

Dikmen, I, Birgonul, M T and Budayan, C (2009) Strategic Group Analysis in the Construction Industry. Journal of Construction Engineering and Management, 135(04), 288–97.

Goodrum, P M, Zhai, D and Yasin, M F (2009) Relationship between Changes in Material Technology and Construction Productivity. Journal of Construction Engineering and Management, 135(04), 278–87.

Lucko, G (2009) Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions. Journal of Construction Engineering and Management, 135(04), 246–53.

Sawhney, A, Walsh, K D, Bashford, H H and Palaniappan, S (2009) Impact of Inspected Buffers on Production Parameters of Construction Processes. Journal of Construction Engineering and Management, 135(04), 319–29.

  • Type: Journal Article
  • Keywords: Buildings, residential; Production management; Resource management; Simulation models; Inspection; Productivity; Project management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2009)135:4(319)
  • Abstract:
    This paper examines the production implications of quality control inspections conducted on the buffer between processes in a construction project by modeling the linkage between these processes. Inspection of partially completed work at the end of one activity but before the beginning of work by the next activity is fairly common. Work that is deemed to be of sufficient quality is then made available for the next activity. Work that is deemed insufficient requires rework, typically by the trade appropriate to the activity that fed into the buffer, to bring the work into compliance. This has implications for workload management for that trade, of course, as well as for the reliability of work flow to the successor or downstream processes. While such situations are common in all construction sectors, an example from the residential construction sector was examined via a simulation model augmented by field data collected from residential construction projects. The impacts of the work flow into the predecessor process, the inspection pass rate, and resource availability were examined. The inspection pass rate was found to dramatically affect the reliability of work flow, unless resources are unlimited. Furthermore, the inspection pass rate was found to be functionally related to the production parameters of the process.

Shapira, A and Simcha, M (2009) AHP-Based Weighting of Factors Affecting Safety on Construction Sites with Tower Cranes. Journal of Construction Engineering and Management, 135(04), 307–18.

Sobeih, T, Salem, O, Genaidy, A, Abdelhamid, T and Shell, R (2009) Psychosocial Factors and Musculoskeletal Disorders in the Construction Industry. Journal of Construction Engineering and Management, 135(04), 267–77.

Surahyo, M and El-Diraby, T E (2009) Schema for Interoperable Representation of Environmental and Social Costs in Highway Construction. Journal of Construction Engineering and Management, 135(04), 254–66.

Tuholski, S J, Gursel, A P, Tommelein, I D and Bomba, G (2009) “Lean” Comparison Using Process Charts of Complex Seismic Retrofit Projects. Journal of Construction Engineering and Management, 135(04), 330–9.

Wu, M and Lo, H (2009) Optimal Strategy Modeling for Price-Time Biparameter Construction Bidding. Journal of Construction Engineering and Management, 135(04), 298–306.